Elliott wrote:
I've created a couple of jobs that are not scheduled or enabled. I run them when I want to by selecting "Run Highlighted Jobs Now" This works great for me for those specific jobs. I'm wondering why those jobs still show up under the "Next Run" column as they really don't have a next run time or date since the they are not enabled and the schedule isn't turned on.
I think the interface would be cleaner and tell me more pertinent information if those only the jobs that are enabled and scheduled show up in the next run column.